Advice & Guides

How long does it take to install a roof?

A typical house re-roof takes a few days to around a week. Here is what sets the timescale, and what happens on each.

A realistic timescale

For a typical house, a full re-roof usually takes from a few days to around a week. A small, simple roof can be quicker; a large or complex one, or one that needs timber work, takes longer.

The weather plays a part. Roofers work with the roof open at times, so heavy rain or high winds can add a day here and there for safety, which is normal and not a sign anything is wrong.

What affects it

The size and pitch of the roof, the tile or slate chosen, whether any rafters or battens need replacing, and how the scaffolding goes up all feed into the timescale. A roof with lots of valleys, dormers and chimneys takes more detailing than a plain one.

Stripping the old covering, repairing timbers, laying new underlay and battens, and then tiling and detailing the ridges and edges are each their own stage, and we work through them in order.

Keeping you informed

We give you a realistic timescale with your written quote, not an optimistic one, and we keep you updated as the job moves along so there are no surprises. Tidy-up and waste removal are part of the job, not an afterthought.

Need a hand with your roof?

We offer free, no-obligation surveys across Bedworth, Warwickshire and Solihull. If something is not right up top, we will take a proper look and tell you straight.

Still not sure? Just ask.

A quick call or message costs nothing, and we are always happy to give honest advice before you spend anything.